From 2020 to 2022, Draco Group successfully completed five projects in Carletonville, West Driefontein and Welkom for Sibanye Stillwater.
By forming joint venture partnerships with local companies in these areas, we completed the demolition and rehabilitation of:
- Phuthaditjaba and Tsephong Hostels
- Security Barracks
- Shaft 11
- Beatrix 2 Shaft
- Kopanang Hostels
Covering a total area of 80,000m2, the projects included the demolition and removal of various single- and multi-storey buildings, warehouses, ventilation ducts, conveyer systems, a steel headgear, concrete water tanks, thickeners, concrete hard stands, tarmac roads and foundations. The ventilation shaft duct of Shaft 11 was also backfilled with rubble and the main shaft capped. On each of these projects, asbestos prefab buildings, fascia boards and ceilings needed to be legally disposed of as per the Mine Health and Safety Act, and the necessary certification obtained once the material was delivered to a licensed hazardous landfill site.
The areas were all shaped and levelled as per the environmental management plan to accommodate water and drainage. All exposed openings were closed and the site was left in a safe and environmentally friendly condition.